How Long for Screed to Dry Before Karndean? [Guide 2026]
Short answer: for a traditional sand and cement screed, plan on 1 day of drying per millimetre, so a 50 mm screed needs about 50 days, and then lay the Karndean only after a moisture test passes. Karndean is a moisture-sensitive luxury vinyl covering, and its adhesive bond fails on a damp screed, so the
How Long for Screed to Dry Before Karndean? [Guide 2026] Read More »
