Floor screed is a common building material used to provide a smooth, level surface prior to laying floor finishes. As with any building material, floor screed has both advantages and potential drawbacks. This article will examine the key pros and cons of floor screed in 2024 to help you make an informed decision about using it in your project.

What is Floor Screed?

Floor screed, also known as concrete screed, is a mix of sand, cement, and water installed on top of a concrete slab or substrate. It provides a smooth, level surface for floor finishes like tile, vinyl, or carpeting. The screed mix is poured onto the subfloor while wet, then flattened and smoothed to the desired thickness using a screed board.

Pros of Using Floor Screed

Provides a Durable, Long-Lasting Surface

One of the main upsides of floor screed is its longevity when properly installed. The cement and sand screed mix creates a very durable layer built to last for decades. This makes it well-suited for all residential and commercial flooring applications.

Allows Flexibility in Floor Finishes

An advantage of floor screed is it can be topped with almost any floor covering, from carpet to wood to marble tile. Its smooth surface readily accepts a variety of adhesives and underlayments. This versatility makes it a wise choice for multi-purpose rooms.

Offers Good Acoustic and Thermal Properties

Floor screed also provides sound and thermal insulation. Its mass helps block transfer of sound between floors in multi-story buildings. It also holds heat and contributes to more comfortable ambient temperatures. These added acoustic and heating/cooling benefits are useful in many homes and workspaces.

Can Be Laid Quickly

Floor screed application is relatively fast compared to installing a new concrete subfloor. After prepping the area, the screed can simply be poured and finished within hours or days. This allows construction schedules to proceed without delaying flooring installation.

Cons or Challenges of Using Floor Screed

However, there are also some potential drawbacks of floor screed to factor into your decision:

Prone to Cracking if Poorly Installed

One risk with cement-based screeds is cracking over time. If the mix ratio or curing process isn’t carefully controlled, it can dry and cure unevenly. This results in cracks that allow moisture underneath and require repairs. Avoiding this requires hiring an experienced screed installation company.

Can Be Cold Underfoot

The cement-based mix also retains some chill from the concrete below, especially in basement rooms or on bare ground floors. This can leave floors noticeably cold without sufficient insulation or underfloor heating. Rugs, thermal underlayments or radiant heating systems help increase comfort.

Heavy Weight Requires Structural Planning

Floor screed weighs about 100 pounds per cubic foot. The mass adds substantial load requiring structural planning so substrates don’t fail or subside. Lightweight aggregate can reduce weight, but the surface may be less durable. Communicating expected loads to builders is necessary.

Has Long Curing and Drying Times

Newly poured screed requires weeks to fully cure and dry before applying finishes or permitting foot traffic. Moisture from the screed can also interact poorly with adhesives if not fully dried. Planning for these slow dry times is essential to prevent flooring failures or delays.

Prone to Sanding and Grinding Issues

Getting a screed layer perfectly smooth often requires grinding or sanding prior to flooring. But this exposes more sand and aggregate at the surface. The uneven sand layer causes some adhesives and coatings to fail prematurely. Multiple smoothing passes helps address this.

Higher Initial Cost than Other Subfloors

Finally, the poured cement screed and labor required may cost more upfront than alternatives like plywood or oriented strand board (OSB). But its longevity provides better ROI long-term. Weighing lifecycle costs against initial budget is recommended.

Which Types of Flooring Work Best on Screed?

You can install most floor finishes over level floor screed:

  • Tile or Stone
  • Vinyl Planks
  • Carpet
  • Wood Laminate
  • Painted Concrete

The key is ensuring the screed cures completely and testing moisture content before attaching final floors. Moisture mitigation barriers may be advisable in basements or ground floor applications prone to moisture migration.

Is Underfloor Heating Compatible with Screed?

Yes, provided some special design considerations are made…

Conclusion

Floor screed offers a durable, flexible interior floor, but may add cost upfront and requires careful installation to prevent cracking or moisture issues. With power trowel finishing and proper curing time, it creates an excellent substrate for all types of floor coverings. Weigh the pros and cons presented here when deciding between floor screed or alternatives like concrete, wood or composite subfloors. Reach out to experienced screed professionals for recommendations specific to your project requirements.

FAQs

How thick should floor screed be?

Between 35-75 mm is typical, with 50 mm average depth for most residential floors. The thickness should match flooring requirements.

What mix ratio is best?

A mix ratio of 1 part cement to 4 or 5 parts sand aggregate is common, with just enough water for workability.

How long does floor screed take to dry?

4 weeks is minimum, with up to 12 weeks for thicker applications, before applying finishes or loading fully.

Can you put screed over insulation?

Yes, screed over insulation builds up thermal mass. Ensure insulation covers piping to prevent cold bridging.

Does screed need reinforcement?

Some fiber reinforcement helps control cracking but isn’t always necessary in smaller residential applications.